Breaking News: CPI Energy solves Power Quality problems

 CPI Energy Companies™ has solved seriously-recurring power quality and energy efficiency problems in the solar wafer manufacturing plant of First Philec Solar Corporation. CPI employed its energy efficiency engineering expertise and Class-A referential Power Quality solutions in FPSC’s fully-integrated plant in Batangas after incurring problematic power quality. A number of solutions were earlier offered by contractors to no avail. FPSC is the country’s largest solar wafer manufacturing company with a fully-integrated, state-of-the-art plant in Batangas and plans to expand in Mindanao.

 

Energy

Environment

Transportation, Communications, Broadcasting, and Information Technology

Energy

    • Coal Hybrid Liquefaction Technology: Combining Direct and Indirect Process Configuration. Development Plan. Department of Energy and Headwaters Technology Innovation Group Inc. & H&WB Corporation.
    • Promotion of Renewable Energy, Energy Efficiency and Greenhouse Gas Abatement (PREGA 1 and 2). National Technical Expert. Asian Development Bank.
    • Philippine Efficient Lighting Market Transformation Project, Contributor/Participant. Department of Energy and United Nations Development Programme.
    • Ecobriquettes International, LLC, 300 KTPA Production Plant, Pre-Feasibility Study.
    • Steam Plant for Monde Nissin Corp., Energy Conversion Agreement
    • Preliminary Front-End & Engineering Design (“Pre-FEED”) for the Philippine Naphtha Cracker Plant Project. Proponent: PNOC-Petrochemical Development Corporation
    • “Recoverable Energy Thermal Complex”-A National Priority Project. Project Owner: PNOC-ENERGY DEVELOPMENT CORP.
    • 40-MW BACMAN II Geothermal Optimization Power Plant Project. Project Proponent: PNOC-ENERGY DEVELOPMENT CORP.
    • “Efficient Lighting Showcase and Demonstration Project,” Efficient Lighting Initiatives, Department of Energy.
    • Centralized Terminal Facilities (CTF) Project in the Philippines; Feasibility Study in cooperation with Cosmo Engineering Co. Ltd.; Japan Bank for International Cooperation (JBIC) funded; Project Proponent: PNOC Alternative Fuels Corporation (PAFC).
    • Technical Assistance on EEL Lamp Ballast and Luminaire Manufacturing; United Nations Development Programme (UNDP); Philippine Efficient Lighting Market Transportation Project (PELMATP).

      back to top


Environment

    • Master Plan for Metro Manila Solid Waste and Industrial Waste Management and Treatment System, September 9, 2001, Consultant.
    • Manila Bay Integrated Environment Improvement (MBIEIP) Project, November 2002, Proponent.
    • Distillery Plant Waste Water System Upgrading, San Miguel Corporation, October 2002, EPC Contractor.
    • Consolidated Distillers of the Far East's Alcohol Production Capacity, Lian, Batangas, Technology application, EPC Contractor.
    • Continuous Emissions Monitoring Systems (CEMS) under the Philippines Clean Air Act of 1999, EPC Contractor.

    back to top


Transportation, Communications, Broadcasting, and Information Technology

    • Upgrading and Expansion of the National Broadcasting Network, Peoples Television Network, Inc. Channel 4, Consultant.